KITUI, KENYA

Copper & investor information

High-grade copper ore from our Kitui project — sourced, assayed and prepared for export under a phased, compliance-led plan.

The project

The Kitui copper project

An oxide-copper project in Kitui West, Kenya, built around an artisanal mining (ASM) cooperative’s ore stockpile as first-phase supply, with pit-by-pit assay work extending the data set toward a full, tonnage-weighted composite grade.

Assaying is carried out in the field with a handheld XRF instrument and progressively confirmed against accredited laboratory analysis — including acid-soluble copper and XRD phase identification. Negligible sulfur across samples on file supports an oxide-copper leach – solvent extraction – electrowinning (SX-EW) processing route to LME Grade-A cathode.

Every commercial parcel is settled against independent umpire assay at the point of discharge. The figures on this page describe the ore body, pricing methodology and roadmap — not a standing quotation. Request our current offer directly for commercial terms.
Ore profile

What we ship

CommodityHigh-grade copper ore (oxide), granulated 0–30 mm
OriginKitui West, Kenya
Copper gradeWide-ranging across pit samples to date; commercial parcels are graded and priced against independent umpire assay rather than a blended average
MoistureTypically 8–12% by weight
Packaging1 MT FIBC (jumbo) bags with inner liner
Delivery basisFOB / DAP via bonded warehouse, Port of Mombasa
Route to metalCrush → leach (heap/agitation) → solvent extraction → electrowinning (SX-EW) → LME Grade-A cathode
Pricing approach

Priced on payable metal, not a flat number

We price copper ore on a payable-metal (netback) basis: the LME cash copper price, applied to assayed copper content and an agreed payability percentage, less quality adjustments — settled on a dry-tonne basis against independent umpire assay at discharge.

Quoting as a formula rather than a flat figure keeps pricing transparent for both sides: it moves with the market price, and it reconciles against the actual assayed grade of each parcel rather than a single composite number.

Request the current offer

For commercial terms, quantities and current pricing, contact our trading desk directly.

Email mining@infomema.com →
Roadmap

A phased path to scale

Capacity builds in stages, tied to confirmed reserves and demonstrated production — not promised ahead of the data.

Phase 0 · Pilot & compliance build-out

Sampling, assay and licensing

Complete the five-pit sample set with tonnage estimates, accredited composite assay, and file the mining & export licensing pathway.

Phase 1 · Months 3–12

Initial trial shipments

First export parcels move under trial terms while production and logistics are proven out at modest, sustainable volumes.

Phase 2 · Year 2

Scale-up

Volumes step up as supply, processing and offtake relationships mature.

Phase 3 · Year 3+

Design capacity

Toward full design capacity as the SX-EW processing route comes online — a target we build toward in stages, not a Year-1 commitment.

Compliance & licensing

Built on the regulatory pathway, not around it

Mining & export licensing

Mineral Dealer’s Licence and Mineral Export Permit filed through the Kenya Mining Cadastre Portal, under the Mining Act, 2016.

Environmental licensing

NEMA Environmental Impact Assessment for the processing facility, led by a NEMA-registered EIA Expert.

Land & community consent

Community Land Act consent process for Kitui’s community/trust land, alongside county land-title verification.

Royalties & taxation

Royalty and tax obligations under the Mining (Royalty Collection and Management) Regulations, 2024, factored into our pricing model from the outset.

Interested in the Kitui copper programme?

Speak with our trading desk about the current offer, sampling data, or a site visit.